Deployment Plan Form
1. Project Title: _____________________
2. Architecture (Readiness) Review Date requested: ____________________
Second date requested: _____________________________
3. Estimated Cost of Deployment:
A: Total Costs:
B: Hardware costs (itemized):
C: Software costs (itemized):
D: Internal headcount costs (estimated hours x $100/hour):
E: Other labor costs (e.g. hired from outside Cisco):
F: Travel costs:
G: Tools and parts costs:
H: Other costs (described):
Contact Phone: |
Contact e-mail. |
|
5. Microsoft Project:
If there are over 6 steps to the deployment process, attach the Deployment Plan steps in Microsoft Project form.
List each physical location in order of deployment, and the planned date (or range of dates) for each location.
Location: |
Date: |
Other Info. |
| e.g. Brussels | e.g. 4/24 - 4/30 | e.g. Stage 1 router with E-1 card. |
| Stage: 1 | Work: e.g. Order all WAN circuits for Tier 1 (hub) locations |
| Step: 1 | Responsibility: e.g. Project Manager (name). |
| Tools Needed: e.g. Not Applicable (NA) | |
| Tools Present: e.g. (NA) | |
| Preceding steps: e.g. None. | |
| Following steps: e.g. Steps 4 - 17 require successful WAN circuit installation. | |
| Duration: e.g. 45 days, according to circuit vendor. | |
| Start/end dates: e.g. Order April 5th, Deliver by May 20th. | |
| Stage: | Work: |
| Step: | Responsibility: |
| Tools Needed: | |
| Tools Present: | |
| Preceding steps: | |
| Following steps: | |
| Duration: | |
| Start/end dates: |
A: Hardware, Software: Describe or show diagram of new architecture and connections. Respond for each stage. __________________________________________________________________
B: Configuration, Scripts: Attach copies of the configuration files or scripts which will be loaded at each site type, based on the Architecture Plan.
9. Contingency (backout) Plan:
Describe: _____________________________________________________
Yes |
No |
Description of your Project: My project |
| I verify that each person deploying this equipment / software / configuration in the production network has had at least one prior dry run session deploying identical network elements in a lab environment. |
If No, explain why: ____________________________________________________