Test Plan Form Test Team
| Name | Phone | |
Design Test Lab/Training Environment
List What will be Tested
Type |
Description |
| e.g. Interface | e.g. PRI T-1 connection between Cisco AS 5300 and PBX |
Type = Hardware, Software, Configuration, Interface
Show the Lab Layout Plan
If there are more than 3 items to be tested (listed above), draw a diagram (e.g. in Visio) of the Test Lab environment.
List What Tests you will Run
Type |
Description |
Tests to run |
| e.g. Interface | e.g. PRI T-1 connection between Cisco AS 5300 and PBX | e.g. successful passing of calls from PBX to router, from router to PBX, under full load (up to 1.4 Mbps). |
Write Test Results
Deployment Implications
Attach the configuration templates you developed and tested for deployment.
Support Implications
Attach any suggestions you developed for support personnel here.
Training Accomplished
Yes |
No |
While testing, I have: |
| Trained the deployment team with hands-on run-throughs of the deployment process. | ||
| Trained support staff with hands-on access to the monitoring and configuration systems of the new products. |
If you answered "No", explain why.
____________________________________________________________________
Other
What other information should be recorded based on the test results?
_________________________________________________________________
Single stage migration. |
|
Multiple stage migration. |
Architecture Review Dates
Note: Same date as Architecture Plan date
Submit Form | Clear Form
Yes |
No |
Do the new network elements affect network capacity, usage, availability, performance, or any other form of service quality? |
If yes, describe. Use the checklist as a guideline.
Copyright © Cisco Systems, Inc. 1998